We did a conversion and was told this and when asked about kitchen was told about regs, also friends had to ditch their island idea as wasn’t enough room. I’d have thought she would need it signed off if she’s had to install a beam where there was a supporting wall.They wouldn’t need council
Permission for Internal work like thst, only a building permit for anything structural. Those regs will be for new builds .
Last edited: