Just as a reminder, this is a list of all the projects Stephanie has mentioned, planned, or been working on at the Heap in the Middle of Nowhere.
This list was originally compiled by
@Rory on November 19, 2020…
Almost 3 years ago. She’s collected $34,000 x 12 x 3 = $1,224,000 in tax free Patreon Association money
alone in that time. Plus YouTube revenue, sponsorships, and B&B revenue.
Interesting to read about all the false promises over the last three years…smoke and mirrors…
Projects List
Renovations ::: restoration
Dated : 19-11-2020
Incomplete at this date
Author
@Rory
Rory
VIP Member
Today at 4:34 AM
Add bookmark
#131
Just doing a La La stocktake, stimulated by some fans' comments and also comments on the zero gain in property value. Also hope some of the frenzied fans read this as a courtesy reminder of the current inhabitable status of the farmhouse.
Current projects:
1. THE BASICS - infrastructure to be habitable
1.1 Working heating - replacement units
and new/expanded units needed
- gathered funds for this purpose from patron - seems egar to do facade first- claims will be done in winter 2024
1.2 Water pressure? (toilet not flushing)
1.3 Hot water?
1.4 Windows - rotted, repainting throughout
1.5 Damp/mould problems especially
back corridor
1.6 Ceiling fix for recent leaks back
corridor and kitchen
1.7 Facade falling down - Claims t have sent planning permission to council to move some windows to match the old pre fire façade - allegedly sent in in late spring - waiting updates
1.8 Shutters at risk of falling down, some
need replacement - currently have old shutters in attic of doom
1.9 No roof contingency savings plan
1.10 Mouse infestation in kitchen. Bats and
Owls have to be tolerated due to
protected status.
1.11 External stairs to gites, fire stairs
2. WORKING AREAS (ie contribute to earning money) - practicalities for community living & BnB, Gites
2.1 Kitchen - working stove, suitable bench
tops for food prep and storage (height and
surface). SJ desired a new fridge and
stove.
2.2 Downstairs Loo ( completed)
2.3 Gites -
a) Natti's needs completion ( waiting on the return of Ian- who seems to have run away), - currently storage for the GAG gift pile
upgrade Nic's & Marquis apartment
b) Gerry's to be built/completed - began on channel 4 - unsure on current status
2.4 Peacock bedroom & wallpaper -
currently half a wall of paper missing
2.5 Locks on all bedroom and gite doors.
NOTE: The pantry/wine cellar has one.
3. PUBLIC AREAS
3.1 Grand Salon - panelling ( currently waiting on anne marie)
3.2 Winter salon - library shelves
3.3 Petite salon - functioning- however desire
to paint it purple
3.4 Dining Room - still waiting for final
curtain (16 years) and the tutorial (2 years)
3.5 Patio area - stairs, wall, flooring/base - Currently crumbling and unstable
3.6 The Chapel - roof done, windows almost
complete, the restoration internally waiting on missing chapel restorer ( last seen months ago)
3.7 Leisure area - the pool, swimming pond,
3.8 Marquee salon - current under construction by Anne Marie with panelling - will be shown on channel 4 ( potentially autumn 2022)
3.9 - The LAKE - claims to have 1000 of £ in funds away for this -said has done survey 2/3.
4. PRIVATE AREAS
4.1 SJ bedroom/office/dressing
room/bathroom - walls, floor, decor
4.2 China Pantry completion, at moment
just concrete floor, incomplete walls ( Waiting on return of Ian)
4.3 Attic completion - one half strewn with
junk - talk of turning it into a Billard room
5 - Outdoor space
5.1 Chapel garden completed summer 2022
5.2 - plans for amphitheatre and other gardens on patron video - no defined start date